Homepage | Set Home | Add to Favorites
Member

Richforth Home Products Company


Products
  • No Category
Search
 

Friends links
  • No link

Pump Module for Dodge Challenger Charger Magnum Chrysler 300
Click image to view full size image
Product: Views:61Pump Module for Dodge Challenger Charger Magnum Chrysler 300 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-26 13:23
  Inquiry
Details
Model Number: E7241M FG1052 SP7048M F3252A FG105 Key Specifications/Special Features: Suitable for:Left for 18 gallon t2010, Chrysler, 300 Base Sedan 4-Door, 2.7L 2700CC 167Cu In, V6 GAS DOHC naturally aspiratedLeft For 18 gallon t2010 Chrysler 300 Base Sedan 4-Door3.5L 3518CC 215Cu I V6 GAS SOHC naturally aspiratedLeft For 18 gallon t2010 Chrysler 300S, Sedan 4-Door, 5.7L, 345Cu In, V8 GAS OHV naturally aspiratedLeft For 18 gallon t2010 Dodge Challenger R/T Coupe 2-Door, 5.7L 348Cu In, V8 Gas OHV naturally aspiratedLeft For 18 gallon t2010 Dodge Challenger, SE Coupe 2-Door, 3.5L 3497CC 215Cu In V6 GAS SOHC naturally aspiratedLeft For 18 gallon t2010 Dodge Charger R/T, Sedan 4-Door, 5.7L 345Cu In V8 GAS OHV naturally aspirated100 percent tested throughout entire manufacturing process for worry free, out-of-the-box performanceMeets or exceeds OEM quality standardsModified return porting enhances performance and flow over OE design
  • Triple barb hose fitting ensures positive seal for continuous fuel flow
  • Upgraded flexible fuel line for maximum durability
  • Improved pump to flange harness for dependable electrical performance
  • Ceramic sender card and vehicle specific float arm ensure accurate fuel gauge readout
  • Additional pump isolator and secure-fit feet improve noise damping over original equipment
  • Upgraded dual inlet design ensures top performance and lower amperage draw
  • Dual zone filtration allows for superior contamination resistance
  • Backed by a limited lifetime warranty
  • Shipping Information:
    • FOB Port: Shanghai
    • Lead Time: 20 - 30 days
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe
    Inquiry